NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 09.09.2007
: 20620.5304MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 09.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 28.110 | 28.339 | 267.948 | 306.9583 | 309.798 | 4223.023 | 4355.8493 | 4397.607 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
5.849 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 4.124 | 17:12 | 0:00 | 0:00 | 0:00 | 6:48 | 0:00 | 24:00 |
| Unit-3 | 5.717 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 5.624 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 5.599 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 1.426 | 6:08 | 0:00 | 0:00 | 0:00 | 17:52 | 0:00 | 24:00 |
| Total | 28.339 | 119:20 | 0:00 | 0:00 | 0:00 | 24:40 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
298.00 |
Max. Dam Level |
1490.85 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
298.00 |
Min. Dam Level |
1482.00 |
Wangtoo |
1448 | 5:00 | 1272 | 13:00 |
|
Water Spillage |
0.00 |
Max.TRT Level |
1006.50 |
SFT |
NA | NA | NA | NA |
|
Min. Dam Level |
1004.50 |
Draft Tube |
513 | 6:00 | 229 | 18:00 | ||