NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 05.09.2007
: 20490.3454MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 05.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 35.568 | 35.921 | 148.860 | 177.840 | 179.613 | 4103.935 | 4226.731 | 4267.422 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
6.002 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 5.983 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 6.008 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 6.012 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 6.009 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 5.9907 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Total | 35.921 | 144:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
529.00 |
Max. Dam Level |
1494.05 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
374.00 |
Min. Dam Level |
1493.90 |
Wangtoo |
1723 | 7:00 | 1480 | 19:00 |
|
Water Spillage |
155.00 |
Max.TRT Level |
1007.00 |
SFT |
1288 | 20:00 | 1083 | 4:00 |
|
Min. Dam Level |
1007.00 |
Draft Tube |
1160 | 13:00 | 678 | 11:00 | ||