NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 04.09.2007
: 20454.4244MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 04.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 35.568 | 35.910 | 119.088 | 142.272 | 143.692 | 4074.163 | 4191.163 | 4231.501 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
5.990 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 5.998 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 6.019 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 5.900 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 6.015 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 5.988 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Total | 35.910 | 144:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
547.00 |
Max. Dam Level |
1494.05 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
374.00 |
Min. Dam Level |
1490.90 |
Wangtoo |
1796 | 1:00 | 1417 | 13:00 |
|
Water Spillage |
173.00 |
Max.TRT Level |
1007.00 |
SFT |
1043 | 16:00 | 930 | 12:00 |
|
Min. Dam Level |
1007.00 |
Draft Tube |
1039 | 16:00 | 629 | 6:00 | ||