NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 01.09.2007
: 20346.6624MU
Year 2007–2008
( DAILY GENERATION REPORT FOR : 01.09.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 29.772 | 35.568 | 35.930 | 29.772 | 35.568 | 35.930 | 3984.847 | 4084.459 | 4123.7390 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
5.969 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 5.968 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 6.022 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 5.984 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 6.006 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 5.981 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Total | 35.930 | 144:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 144:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
577.00 |
Max. Dam Level |
1494.00 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
374.00 |
Min. Dam Level |
1493.00 |
Wangtoo |
1986 | 8:00 | 1705 | 24:00 |
|
Water Spillage |
203.00 |
Max.TRT Level |
1007.00 |
SFT |
1171 | 4:00 | 1103 | 16:00 |
|
Min. Dam Level |
1005.50 |
Draft Tube |
876 | 24:00 | 673 | 9:00 | ||