NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 11.09.2007 :  20675.0044MU
Year 2007–2008

( DAILY GENERATION REPORT FOR : 11.09.2007)

GENERATION DATA(MU)

Daily Monthly Cuml. Yearly Cuml.
MOU Target Schedule Target Actual MOU Target Schedule Target Actual MOU Target Schedule Target Actual
28.402 26.6525 26.7650 326.1220 361.1463 364.2720 4281.1970 4410.0373 4452.0810

 
Unit No. Daily (MU) Running Hours Planned Outage Forced Outage Due to Breakdown in M/C  Misc. Availability
Reservoir flushing/ high silt Less avail. of water Grid Constraints etc
Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min.

Unit-1

0.570 2:26 4:00 2:34 0:00 15:00 0:00 24:00
Unit-2 5.710 24:00 0:00 0:00 0:00 0:00 0:00 24:00
Unit-3 5.093 21:23 0:00 0:00 0:00 2:37 0:00 24:00
Unit-4 4.695 19:51 0:00 0:00 0:00 4:09 0:00 24:00
Unit-5 5.377 22:45 0:00 0:00 0:00 1:15 0:00 24:00
Unit-6 5.320 22:30 0:00 0:00 0:00 1:30 0:00 24:00
Total 26.755 112:55 4:00 2:34 0:00 24:31 0:00 144:00

HYDROLOGICAL DATA
 
Discharge for Generation Satluj & Sholding (Cumecs) Levels (Meters) SILT (PPM)

Inflow for Generation

271.00

Max. Dam Level

1491.90  

Max.

at (H:m)

Min.

at (H:m)

Water Utilized

271.00

Min. Dam Level

1479.35

Wangtoo

1201 15:00 971 5:00

Water Spillage

0.00

Max.TRT Level

1006.00

SFT

NA NA NA NA
   

Min. Dam Level

1005.50

Draft Tube

332 4:00 220 8:00