NATHPA
JHAKRI HYDROELECTRIC POWER STATION
Total Power Generated till 10.08.2007
: 19895.4474MU
Year
2007–2008
( DAILY GENERATION REPORT FOR : 10.08.2007)
GENERATION DATA(MU)
| Daily | Monthly Cuml. | Yearly Cuml. | ||||||
| MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual | MOU Target | Schedule Target | Actual |
| 20.274 | 30.000 | 30.3430 | 202.740 | 323.785 | 327.0680 | 3313.044 | 3637.5515 | 3672.524 |
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage Due to Breakdown in M/C |
Misc. |
Availability |
||
| Reservoir flushing/ high silt | Less avail. of water | Grid Constraints etc | ||||||
| Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | Hr:Min. | ||
|
Unit-1 |
6.004 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-2 | 6.011 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-3 | 6.144 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-4 | 6.073 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-5 | 6.111 | 24:00 | 0:00 | 0:00 | 0:00 | 0:00 | 0:00 | 24:00 |
| Unit-6 | 0.000 | 0:00 | 0:00 | 24:00 | 0:00 | 0:00 | 0:00 | 0:27 |
| Total | 30.343 | 120:00 | 0:00 | 24:00 | 0:00 | 0:00 | 0:00 | 120:00 |
HYDROLOGICAL DATA
|
Discharge for Generation Satluj & Sholding (Cumecs) |
Levels (Meters) |
SILT (PPM) |
||||||
|
Inflow for Generation |
800.00 |
Max. Dam Level |
1493.60 |
Max. |
at (H:m) |
Min. |
at (H:m) | |
|
Water Utilized |
374.00 |
Min. Dam Level |
1493.40 |
Wangtoo |
3402 | 1:00 | 2535 | 6:00 |
|
Water Spillage |
426.00 |
Max.TRT Level |
1008.00 |
SFT |
2520 | 8:00 | 2317 | 4:00 |
|
Min. Dam Level |
1007.00 |
Draft Tube |
1686 | 7:00 | 968 | 1:00 | ||