SATLUJ JAL VIDYUT NIGAM LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 27.09.07 is 21068.2714 MU
Year 2006 – 2007  

DAILY GENERATION /TRANSMISSION REPORT FOR 27.09.07

GENERATION (MU) 

DAILY MONTHLY Cuml. YEARLY Cuml. CI* SMI
MOU Target Schedule Target  Actual MOU Target Schedule Target  Actual MOU Target Schedule Target  Actual - -
16.970 19.6250 19.7360 700.5300 751.6206 757.5390 4655.6050 4800.5116 4845.3480
Unit No. Daily (MU) Running Hours  Planned Outage Forced Outage due to break down in M/C Misc. Availability  Remarks
High    PPM/RED

ALERT

Less Avail. of Water Grid Constraints ETC.
Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min. Hr:Min. 1)Unit #2 remained under FO for 0:30 hrs from 00:55 to 01:25 hrs.2)Unit #3 under forced outage due to damage of pole support from 14.09.2007.3)Unit #6 under forced outage due to damage of pole support from 23.09.2007
Unit - 1  4.996 24:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 24:00:00
Unit - 2  4.747 23:30:00 0:00:00 0:30:00 0:00:00 0:00:00 0:00:00 0:00:00 23:30:00
Unit - 3  0.000 0:00:00 0:00:00 24:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00
Unit - 4  4.961 24:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 24:00:00
Unit - 5  5.032 24:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00 24:00:00
Unit - 6  0.000 0:00:00 0:00:00 24:00:00 0:00:00 0:00:00 0:00:00 0:00:00 0:00:00
Total 19.736 95:30:00 0:00:00 48:30:00 0:00:00 0:00:00 0:00:00 0:00:00 95:30:00
   
STATION DATA 
AUX.CONS.&OTHER LOSSES (MU) LOAD BUS VOLT FREQ.
Will be submitted on monthly basis.    MW MVAR KV Hz.
MAX. 1006 73 421 50.10
MIN. 738 -77 413 49.24
HYDROLOGICAL DAT
Discharge for Generation (Cumecs)
Satluj and Sholding 
Level (Meters) SILT (PPM)
Inflow for Generation 203.00 Max. Dam Level 1487.90 Max. at (Hr.Min) Min. at(Hr.Min)
Water Utilized 203.00 Min. Dam Level 1485.25 Wangtoo 689 7:00 587 21:00
Water Spillage 0.00 Max. TRT Level 1005.50 SFT NA NA NA NA
Min. TRT Level 1005.50 Draft Tube 695 8:00 103 6:00