SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 31.05.10 is 37479.306 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 31.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

31.514

32.086

31.810

875.208

923.976

925.059

917.277

1228.838

1358.289

1366.517

1355.117

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.982

5.920

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.849

5.803

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

4.218

4.176

17:24

0:00:00

0:00:00

0:00

6:36

0:00:00

24:00

Unit - 4 

5.978

5.933

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

4.150

4.111

16:50

0:00:00

0:00:00

0:00

7:10

0:00:00

24:00

Unit - 6 

5.909

5.867

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

32.086

31.810

130:14

0:00:00

0:00:00

0:00

13:46

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

>325

Max. Dam Level

1492.55

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

334

Min. Dam Level

1482.70

Wangtoo

1065

13:00

767

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1642

6:00

203

7:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

25

1