SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 30.05.10 is 37447.220 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 30.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

30.074

33.477

33.179

840.060

892.462

892.973

885.467

1193.690

1326.775

1334.431

1323.307

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.028

5.960

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.813

5.768

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.443

5.387

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.034

5.996

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

4.342

4.291

18:18

0:00:00

0:00:00

0:00

5:42

0:00:00

24:00

Unit - 6 

5.817

5.777

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

33.477

33.179

138:18

0:00:00

0:00:00

0:00

5:42

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

309

Max. Dam Level

1493.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

349

Min. Dam Level

1486.95

Wangtoo

1221

1:00

862

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

679

1:00

166

23:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

12