SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 29.05.10 is 37413.743 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 29.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.004

36.489

36.163

804.912

858.388

859.496

852.288

1158.542

1292.701

1300.954

1290.128

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.245

6.185

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.128

6.074

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.836

5.772

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.198

6.158

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.002

5.934

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.080

6.040

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.489

36.163

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

389

Max. Dam Level

1495.05

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

380

Min. Dam Level

1490.80

Wangtoo

1339

1:00

1024

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

691

1:00

378

23:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

14

1