SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 28.05.10 is 37377.254 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 28.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.551

34.912

34.614

769.764

822.384

823.007

816.125

1123.394

1256.697

1264.465

1253.965

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.913

5.853

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.877

5.832

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.589

5.534

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.094

6.055

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.595

5.533

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

5.844

5.807

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

34.912

34.614

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

483

Max. Dam Level

1495.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

364

Min. Dam Level

1493.00

Wangtoo

1661

1:00

1139

11:00

Water Spillage

-

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

997

5:00

598

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

18

2