SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 27.05.10 is 37342.342 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 27.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.323

36.449

36.194

734.616

785.833

788.095

781.511

1088.246

1220.146

1229.553

1219.351

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.179

6.131

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.135

6.102

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.857

5.808

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.168

6.138

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.000

5.940

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.110

6.075

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.449

36.194

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

449

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

380

Min. Dam Level

1493.00

Wangtoo

2722

11:00

1494

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

0

0:00

0

0:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1141

22:00

704

5:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

16

6