Total Power
Generated Till Dated 26.05.10 is 37305.893 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 26.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
35.148 |
36.169 |
36.315 |
36.004 |
699.468 |
749.510 |
751.646 |
745.317 |
1053.098 |
1183.823 |
1193.104 |
1183.157 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
6.167 |
6.105 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
6.157 |
6.111 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
5.907 |
5.847 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
6.165 |
6.126 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
5.736 |
5.672 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
6.183 |
6.143 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
36.315 |
36.004 |
144:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
449 |
Max. Dam Level |
1495.50 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
378 |
Min. Dam Level |
1493.00 |
Wangtoo |
1840 |
19:00 |
1408 |
5:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
0 |
0:00 |
0 |
0:00 | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
985 |
18:00 |
490 |
13:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
20 |
5 | |||||||||||||||