SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 25.05.10 is 37269.578 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 25.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.740

36.112

35.851

664.320

713.341

715.331

709.313

1017.950

1147.654

1156.789

1147.153

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.188

6.116

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.075

6.049

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.801

5.745

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.128

6.109

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.866

5.797

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.054

6.035

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.112

35.851

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

410

Max. Dam Level

1495.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

376

Min. Dam Level

1492.75

Wangtoo

2236

15:00

954

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

3674

7:00

1286

16:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

963

18:00

478

8:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

18