SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.05.10 is 37233.466 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 24.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.075

35.862

35.523

629.172

676.601

679.219

673.462

982.802

1110.914

1120.677

1111.302

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.160

6.098

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.057

5.995

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.810

5.749

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.106

6.062

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.861

5.799

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

5.868

5.820

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

35.862

35.523

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

374

Max. Dam Level

1494.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

374

Min. Dam Level

1492.40

Wangtoo

1969

5:00

931

21:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

829

1:00

503

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

10

3