SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 23.05.10 is 37197.604 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 23.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

36.328

35.817

35.519

594.024

640.526

643.357

637.939

947.654

1074.839

1084.815

1075.779

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.005

5.955

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.021

5.972

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.887

5.831

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.110

6.066

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.825

5.770

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

5.969

5.925

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

35.817

35.519

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

>400

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

373

Min. Dam Level

1492.40

Wangtoo

2265

7:00

1102

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

27287

11:00

4323

20:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1374

12:00

526

6:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

19

4