SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 22.05.10 is 37161.787 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 22.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
35.148 |
29.382 |
29.615 |
29.340 |
558.876 |
604.198 |
607.540 |
602.420 |
912.506 |
1038.511 |
1048.998 |
1040.260 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
6.044 |
5.979 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
4.811 |
4.772 |
19:47 |
0:00:00 |
0:00:00 |
0:00 |
4:13 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
4.379 |
4.331 |
18:06 |
0:00:00 |
0:00:00 |
0:00 |
5:54 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
6.076 |
6.036 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
5.773 |
5.708 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
2.532 |
2.514 |
10:37 |
0:00:00 |
0:00:00 |
0:00 |
13:23 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
29.615 |
29.340 |
120:30 |
0:00:00 |
0:00:00 |
0:00 |
23:30 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
325 |
Max. Dam Level |
1495.20 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
306 |
Min. Dam Level |
1485.15 |
Wangtoo |
2432 |
11:00 |
1142 |
1:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
1456 |
15:00 |
355 |
7:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
6 |
0 | |||||||||||||||