Total Power Generated Till Dated 22.05.10 is 37161.787 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 22.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

29.382

29.615

29.340

558.876

604.198

607.540

602.420

912.506

1038.511

1048.998

1040.260

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.044

5.979

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

4.811

4.772

19:47

0:00:00

0:00:00

0:00

4:13

0:00:00

24:00

Unit - 3 

4.379

4.331

18:06

0:00:00

0:00:00

0:00

5:54

0:00:00

24:00

Unit - 4 

6.076

6.036

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.773

5.708

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

2.532

2.514

10:37

0:00:00

0:00:00

0:00

13:23

0:00:00

24:00

 

Total

29.615

29.340

120:30

0:00:00

0:00:00

0:00

23:30

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

325

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

306

Min. Dam Level

1485.15

Wangtoo

2432

11:00

1142

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1456

15:00

355

7:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

6

0