SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 21.05.10 is 37132.172 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 21.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.148

24.267

24.372

24.175

523.728

574.816

577.925

573.080

877.358

1009.129

1019.383

1010.920

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.705

5.651

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

3.906

3.876

17:05

0:00:00

0:00:00

0:00

6:55

0:00:00

24:00

Unit - 3 

1.984

1.964

8:17

0:00:00

0:00:00

0:00

15:43

0:00:00

24:00

Unit - 4 

4.129

4.104

17:12

0:00:00

0:00:00

0:00

6:48

0:00:00

24:00

Unit - 5 

2.877

2.847

12:37

0:00:00

0:00:00

0:00

11:23

0:00:00

24:00

Unit - 6 

5.771

5.733

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

24.372

24.175

103:11

0:00:00

0:00:00

0:00

40:49

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

-

Max. Dam Level

1494.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

-

Min. Dam Level

1481.35

Wangtoo

1785

1:00

1059

13:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1585

6:00

426

23:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

35

0