SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 20.05.10 is 37107.800 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 20.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
22.296 |
25.607 |
25.998 |
25.778 |
488.580 |
550.549 |
553.553 |
548.905 |
842.210 |
984.862 |
995.011 |
986.745 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
5.808 |
5.749 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
4.227 |
4.196 |
17:32 |
0:00:00 |
0:00:00 |
0:00 |
6:28 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
2.316 |
2.293 |
10:07 |
0:00:00 |
0:00:00 |
0:00 |
13:53 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
5.508 |
5.473 |
22:28 |
0:00:00 |
0:00:00 |
0:00 |
1:32 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
3.741 |
3.698 |
15:46 |
0:00:00 |
0:00:00 |
0:00 |
8:14 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
4.398 |
4.369 |
17:46 |
0:00:00 |
0:00:00 |
0:00 |
6:14 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
25.998 |
25.778 |
107:39 |
0:00:00 |
0:00:00 |
0:00 |
36:21 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
271 |
Max. Dam Level |
1494.65 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
271 |
Min. Dam Level |
1485.15 |
Wangtoo |
3388 |
7:00 |
1865 |
19:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
2116 |
19:00 |
858 |
1:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
53 |