SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 19.05.10 is 37081.802 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 19.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
22.296 |
25.728 |
25.515 |
25.382 |
466.284 |
524.942 |
527.555 |
523.127 |
819.914 |
959.255 |
969.013 |
960.967 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
6.007 |
5.965 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
2.579 |
2.575 |
10:05 |
0:00:00 |
0:00:00 |
0:00 |
13:55 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
2.489 |
2.478 |
10:04 |
0:00:00 |
0:00:00 |
0:00 |
13:56 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
6.053 |
6.032 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
3.632 |
3.595 |
14:13 |
0:00:00 |
0:00:00 |
0:00 |
9:47 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
4.755 |
4.737 |
19:11 |
0:00:00 |
0:00:00 |
0:00 |
4:49 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
25.515 |
25.382 |
101:33 |
0:00:00 |
0:00:00 |
0:00 |
42:27 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
275 |
Max. Dam Level |
1495.00 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
266 |
Min. Dam Level |
1479.45 |
Wangtoo |
4558 |
15:00 |
658 |
1:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
2790 |
19:00 |
337 |
1:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
56 |
1 | |||||||||||||||