SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 18.05.10 is 37056.287 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 18.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

22.296

25.733

26.270

26.017

443.988

499.214

502.040

497.745

797.618

933.527

943.498

935.585

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.003

5.934

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.325

5.276

21:38

0:00:00

0:00:00

0:00

2:22

0:00:00

24:00

Unit - 3 

3.015

2.974

12:11

0:00:00

0:00:00

0:00

11:49

0:00:00

24:00

Unit - 4 

5.351

5.310

21:10

0:00:00

0:00:00

0:00

2:50

0:00:00

24:00

Unit - 5 

1.474

1.461

6:03

0:00:00

0:00:00

0:00

17:57

0:00:00

24:00

Unit - 6 

5.102

5.062

20:25

0:00:00

0:00:00

0:00

3:35

0:00:00

24:00

 

Total

26.270

26.017

105:27

0:00:00

0:00:00

0:00

38:33

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

274

Max. Dam Level

1490.25

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

274

Min. Dam Level

1480.05

Wangtoo

708

9:00

583

5:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1415

8:00

182

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

89

1