SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 16.05.10 is 37001.634 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 16.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
22.296 |
22.998 |
24.375 |
24.178 |
399.396 |
446.330 |
447.387 |
443.621 |
753.026 |
880.643 |
888.845 |
881.461 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
5.985 |
5.926 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
5.300 |
5.261 |
21:10 |
0:00:00 |
0:00:00 |
0:00 |
2:50 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
2.986 |
2.957 |
12:13 |
0:00:00 |
0:00:00 |
0:00 |
11:47 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
3.446 |
3.421 |
13:50 |
0:00:00 |
0:00:00 |
0:00 |
10:10 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
1.718 |
1.700 |
6:55 |
0:00:00 |
0:00:00 |
0:00 |
17:05 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
4.940 |
4.913 |
19:45 |
0:00:00 |
0:00:00 |
0:00 |
4:15 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
24.375 |
24.178 |
97:53 |
0:00:00 |
0:00:00 |
0:00 |
46:07 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
256 |
Max. Dam Level |
1495.10 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
254 |
Min. Dam Level |
1479.90 |
Wangtoo |
567 |
3:00 |
407 |
23:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
1971 |
5:00 |
126 |
13:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
39 |
0 | |||||||||||||||
|
Draft Tube |
66 |
0 | |||||||||||||||