SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 16.05.10 is 37001.634 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 16.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

22.296

22.998

24.375

24.178

399.396

446.330

447.387

443.621

753.026

880.643

888.845

881.461

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.985

5.926

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.300

5.261

21:10

0:00:00

0:00:00

0:00

2:50

0:00:00

24:00

Unit - 3 

2.986

2.957

12:13

0:00:00

0:00:00

0:00

11:47

0:00:00

24:00

Unit - 4 

3.446

3.421

13:50

0:00:00

0:00:00

0:00

10:10

0:00:00

24:00

Unit - 5 

1.718

1.700

6:55

0:00:00

0:00:00

0:00

17:05

0:00:00

24:00

Unit - 6 

4.940

4.913

19:45

0:00:00

0:00:00

0:00

4:15

0:00:00

24:00

 

Total

24.375

24.178

97:53

0:00:00

0:00:00

0:00

46:07

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

256

Max. Dam Level

1495.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

254

Min. Dam Level

1479.90

Wangtoo

567

3:00

407

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1971

5:00

126

13:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

39

0

Draft Tube

66