SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 11.05.10 is 29915.265 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 11.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

22.296

30.606

31.414

31.159

287.916

319.684

317.867

315.262

641.546

753.997

759.325

753.102

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit #6 is under mtc. w.e.f. 08:00 (09/05/2010) for under part mtc.

Unit - 1 

6.349

6.287

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.262

6.224

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.273

6.213

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.296

6.270

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.234

6.165

23:17

0:00:00

0:00:00

0:00

0:43

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

 

Total

31.414

31.159

119:17

0:00:00

24:00:00

0:00

0:43

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

338

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

327

Min. Dam Level

1491.55

Wangtoo

1153

3:00

842

0:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

525

10:00

364

21:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

3

0

Draft Tube

4

0