SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 08.05.10 is 29823.339 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 08.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

30.666

30.924

30.606

212.496

228.722

225.941

224.114

566.126

663.035

667.399

661.954

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.857

5.791

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.590

5.528

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.853

5.785

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

4.704

4.670

18:48

0:00:00

0:00:00

0:00

5:12

0:00:00

24:00

Unit - 5 

3.652

3.610

15:04

0:00:00

8:56:00

0:00

8:56

0:00:00

24:00

Unit - 6 

5.268

5.222

22:03

0:00:00

0:00:00

0:00

1:57

0:00:00

24:00

 

Total

30.924

30.606

127:55

0:00:00

8:56:00

0:00

16:05

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

322

Max. Dam Level

1494.95

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

322

Min. Dam Level

1487.05

Wangtoo

1186

3:00

736

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

584

3:00

430

19:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

7

0

Draft Tube

4

0