SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 07.05.10 is 29792.415 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 07.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

30.797

30.796

30.572

185.934

198.056

195.017

193.508

539.564

632.369

636.475

631.348

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.139

6.091

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.187

6.144

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.058

6.000

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.293

6.255

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

6.119

6.082

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

30.796

30.572

120:00

0:00:00

0:00:00

0:00

24:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

390

Max. Dam Level

1495.10

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

321

Min. Dam Level

1492.95

Wangtoo

1669

7:00

1070

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

903

1:00

459

24:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

6

2

Draft Tube

3

0