SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 06.05.10 is 29761.619 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 06.05.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
26.562 |
32.026 |
31.660 |
31.409 |
159.372 |
167.259 |
164.221 |
162.936 |
513.002 |
601.572 |
605.679 |
600.776 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
6.318 |
6.257 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
6.361 |
6.313 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
6.378 |
6.314 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
6.376 |
6.339 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
0.000 |
0.000 |
0:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
6.227 |
6.186 |
24:00 |
0:00:00 |
0:00:00 |
0:00 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
31.660 |
31.409 |
120:00 |
0:00:00 |
0:00:00 |
0:00 |
24:00 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
434 |
Max. Dam Level |
1495.00 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
330 |
Min. Dam Level |
1493.15 |
Wangtoo |
2840 |
9:00 |
1392 |
23:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
1898 |
1:00 |
618 |
23:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
7 |
0 | |||||||||||||||
|
Draft Tube |
5 |
0 | |||||||||||||||