SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 05.05.10 is 29729.959 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 05.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

31.096

31.217

30.936

132.810

135.233

132.561

131.527

486.440

569.546

574.019

569.367

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.264

6.195

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.100

6.046

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

6.280

6.212

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.312

6.269

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

6.261

6.214

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

31.217

30.936

120:00

0:00:00

0:00:00

0:00

24:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

470

Max. Dam Level

1495.05

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

325

Min. Dam Level

1492.40

Wangtoo

3130

13:00

1846

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

2352

10:00

1159

5:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

8

2

Draft Tube

14

0