SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 04.05.10 is 29698.742 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 04.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

26.434

26.709

26.497

106.248

104.137

101.344

100.591

459.878

538.450

542.802

538.431

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.853

5.793

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

4.557

4.523

19:07

0:00:00

0:00:00

0:00

4:53

0:00:00

24:00

Unit - 3 

4.576

4.529

18:46

0:00:00

0:00:00

0:00

5:14

0:00:00

24:00

Unit - 4 

5.853

5.818

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

5.870

5.834

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

26.709

26.497

109:53

0:00:00

24:00:00

0:00

34:07

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

397

Max. Dam Level

1495.05

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

278

Min. Dam Level

1492.40

Wangtoo

3165

17:00

1362

1:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

2177

20:00

780

4:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

12

0

Draft Tube

4

0