SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 02.05.10 is 29645.950 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 02.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

25.400

23.432

23.259

53.124

51.306

48.552

48.193

406.754

485.619

490.010

486.033

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.255

5.205

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

4.645

4.611

21:14

0:00:00

0:00:00

0:00

2:46

0:00:00

24:00

Unit - 3 

4.479

4.437

19:11

0:00:00

0:00:00

0:00

4:49

0:00:00

24:00

Unit - 4 

4.165

4.145

17:16

0:00:00

0:00:00

0:00

6:44

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

o:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

4.888

4.861

20:40

0:00:00

0:00:00

0:00

3:20

0:00:00

24:00

 

Total

23.432

23.259

102:21

0:00:00

0:00:00

0:00

41:39

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

238

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

244

Min. Dam Level

1486.80

Wangtoo

1123

17:00

846

9:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

628

5:00

170

22:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

7

0

Draft Tube

2