SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 01.05.10 is 29622.518 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 01.05.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

26.562

25.906

25.120

24.934

26.562

25.906

25.120

24.934

380.192

460.219

466.578

462.774

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

5.590

5.527

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

5.515

5.473

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

3.838

3.800

16:36

0:00:00

0:00:00

0:00

7:24

0:00:00

24:00

Unit - 4 

4.634

4.622

19:21

0:00:00

0:00:00

0:00

4:39

0:00:00

24:00

Unit - 5 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

24:00

Unit - 6 

5.543

5.512

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

25.120

24.934

107:57

0:00:00

24:00:00

0:00

36:03

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

260

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

262

Min. Dam Level

1489.30

Wangtoo

1500

1:00

1018

21:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1375

5:00

414

22:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

3

0

Draft Tube

5

0