SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 31.03.10 is 36112.789 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 31.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

12.561

11.767

11.671

233.356

292.869

295.922

293.278

6500.770

6956.963

7018.811

6956.849

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

3.060

3.025

13:39

0:00:00

0:00:00

0:00

10:21

0:00:00

24:00

Unit - 2 

1.776

1.768

7:44

0:00:00

0:00:00

0:00

16:16

0:00:00

24:00

Unit - 3 

0.253

0.250

1:12

0:00:00

0:00:00

0:00

22:48

0:00:00

24:00

Unit - 4 

0.700

0.697

2:55

0:00:00

0:00:00

0:00

21:05

0:00:00

24:30

Unit - 5 

3.244

3.208

14:28

0:00:00

0:00:00

0:00

9:32

0:00:00

24:00

Unit - 6 

2.734

2.723

12:25

0:00:00

0:00:00

0:00

11:35

0:00:00

24:00

 

Total

11.767

11.671

52:23

0:00:00

0:00:00

0:00

91:37

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

123

Max. Dam Level

1494.45

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1479.20

Wangtoo

465

13:00

365

4:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

130

19:00

94

15:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0