SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 30.03.10 is 36101.118 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 30.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

12.810

13.839

13.734

225.110

280.308

284.149

281.607

6492.524

6944.402

7007.038

6945.178

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.373

2.346

9:46

0:00:00

0:00:00

0:00

14:14

0:00:00

24:00

Unit - 2 

4.047

4.042

18:21

0:00:00

0:00:00

0:00

5:39

0:00:00

24:00

Unit - 3 

0.249

0.247

1:04

0:00:00

0:00:00

0:00

22:56

0:00:00

24:30

Unit - 4 

1.773

1.764

7:04

0:00:00

0:00:00

0:00

16:56

0:00:00

24:30

Unit - 5 

3.637

3.584

15:30

0:00:00

0:00:00

0:00

8:30

0:00:00

24:00

Unit - 6 

1.760

1.751

7:27

0:00:00

0:00:00

0:00

16:33

0:00:00

24:00

 

Total

13.839

13.734

59:12

0:00:00

0:00:00

0:00

84:48

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

135

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

144

Min. Dam Level

1481.10

Wangtoo

501

7:00

346

22:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

143

23:00

74

16:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

1

0

Draft Tube

0

0