SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 29.03.10 is 36087.384 MU
Year
2009-2010
DAILY GENERATION REPORT FOR 29.03.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
8.246 |
12.822 |
11.435 |
11.339 |
216.864 |
267.498 |
270.310 |
267.873 |
6484.278 |
6931.592 |
6993.199 |
6931.444 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
1.853 |
1.833 |
8:27 |
0:00:00 |
0:00:00 |
0:00 |
15:33 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
2.861 |
2.845 |
12:43 |
0:00:00 |
0:00:00 |
0:00 |
11:17 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.334 |
0.332 |
1:35 |
0:00:00 |
0:00:00 |
0:00 |
22:25 |
0:00:00 |
24:30 | ||||||||
|
Unit - 4 |
1.499 |
1.491 |
6:20 |
0:00:00 |
0:00:00 |
0:00 |
17:40 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
3.789 |
3.745 |
16:41 |
0:00:00 |
0:00:00 |
0:00 |
7:19 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
1.099 |
1.093 |
5:21 |
0:00:00 |
0:00:00 |
0:00 |
18:39 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
11.435 |
11.339 |
51:07 |
0:00:00 |
0:00:00 |
0:00 |
92:53 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
129 |
Max. Dam Level |
1495.50 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
119 |
Min. Dam Level |
1480.25 |
Wangtoo |
572 |
4:00 |
411 |
22:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
103 |
21:00 |
69 |
9:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
1 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||