SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 28.03.10 is 36076.045 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 28.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

13.004

12.241

12.161

208.618

254.676

258.875

256.534

6476.032

6918.770

6981.764

6920.105

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.647

1.637

7:17

0:00:00

0:00:00

0:00

16:43

0:00:00

24:00

Unit - 2 

2.808

2.791

13:29

0:00:00

0:00:00

0:00

10:31

0:00:00

24:00

Unit - 3 

0.213

0.212

1:00

0:00:00

0:00:00

0:00

23:00

0:00:00

24:30

Unit - 4 

2.508

2.493

10:52

0:00:00

0:00:00

0:00

13:08

0:00:00

24:30

Unit - 5 

3.244

3.216

14:33

0:00:00

0:00:00

0:00

9:27

0:00:00

24:00

Unit - 6 

1.821

1.812

8:06

0:00:00

0:00:00

0:00

15:54

0:00:00

24:00

 

Total

12.241

12.161

55:17

0:00:00

0:00:00

0:00

88:43

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

126

Max. Dam Level

1494.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

128

Min. Dam Level

1482.00

Wangtoo

616

1:00

435

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

149

23:00

78

10:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0