SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 27.03.10 is 36063.884 MU
Year
2009-2010
DAILY GENERATION REPORT FOR 27.03.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
8.246 |
12.280 |
12.608 |
12.533 |
200.372 |
241.672 |
246.634 |
244.373 |
6467.786 |
6905.766 |
6969.523 |
6907.944 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
| |||||||
|
Unit - 1 |
2.244 |
2.227 |
9:22 |
0:00:00 |
0:00:00 |
0:00 |
14:38 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
2.973 |
2.959 |
13:33 |
0:00:00 |
0:00:00 |
0:00 |
10:27 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
0.410 |
0.407 |
1:47 |
0:00:00 |
0:00:00 |
0:00 |
22:13 |
0:00:00 |
24:30 | ||||||||
|
Unit - 4 |
2.454 |
2.444 |
10:39 |
0:00:00 |
0:00:00 |
0:00 |
13:21 |
0:00:00 |
24:30 | ||||||||
|
Unit - 5 |
3.228 |
3.201 |
14:43 |
0:00:00 |
0:00:00 |
0:00 |
9:17 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
1.299 |
1.295 |
5:47 |
0:00:00 |
0:00:00 |
0:00 |
18:13 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
12.608 |
12.533 |
55:51 |
0:00:00 |
0:00:00 |
0:00 |
88:09 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
134 |
Max. Dam Level |
1494.85 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
131 |
Min. Dam Level |
1481.90 |
Wangtoo |
572 |
22:00 |
381 |
19:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
N/A |
N/A |
N/A |
N/A | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
105 |
23:00 |
84 |
9:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
0 |
0 | |||||||||||||||
|
Draft Tube |
0 |
0 | |||||||||||||||