SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 27.03.10 is 36063.884 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 27.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

12.280

12.608

12.533

200.372

241.672

246.634

244.373

6467.786

6905.766

6969.523

6907.944

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.244

2.227

9:22

0:00:00

0:00:00

0:00

14:38

0:00:00

24:00

Unit - 2 

2.973

2.959

13:33

0:00:00

0:00:00

0:00

10:27

0:00:00

24:00

Unit - 3 

0.410

0.407

1:47

0:00:00

0:00:00

0:00

22:13

0:00:00

24:30

Unit - 4 

2.454

2.444

10:39

0:00:00

0:00:00

0:00

13:21

0:00:00

24:30

Unit - 5 

3.228

3.201

14:43

0:00:00

0:00:00

0:00

9:17

0:00:00

24:00

Unit - 6 

1.299

1.295

5:47

0:00:00

0:00:00

0:00

18:13

0:00:00

24:00

 

Total

12.608

12.533

55:51

0:00:00

0:00:00

0:00

88:09

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

134

Max. Dam Level

1494.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

131

Min. Dam Level

1481.90

Wangtoo

572

22:00

381

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

105

23:00

84

9:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0