SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.03.10 is 36026.785 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 24.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.246

12.130

12.144

12.077

175.634

204.973

209.300

207.274

6443.048

6869.067

6932.189

6870.845

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.286

2.273

10:21

0:00:00

0:00:00

0:00

13:39

0:00:00

24:00

Unit - 2 

2.949

2.936

12:38

0:00:00

0:00:00

0:00

11:22

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

3.045

3.032

12:29

0:00:00

0:00:00

0:00

11:31

0:00:00

24:30

Unit - 5 

2.740

2.716

11:16

0:00:00

0:00:00

0:00

12:44

0:00:00

24:00

Unit - 6 

1.124

1.120

4:53

0:00:00

0:00:00

0:00

19:07

0:00:00

24:00

 

Total

12.144

12.077

51:37

0:00:00

0:00:00

0:00

92:23

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

128

Max. Dam Level

1493.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

127

Min. Dam Level

1479.45

Wangtoo

546

10:00

396

19:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

160

18:00

109

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0