SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 20.03.10 is 35977.070 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 20.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

9.959

10.546

10.492

142.650

154.230

159.225

157.559

6410.064

6818.324

6882.114

6821.130

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.762

0.758

3:53

0:00:00

0:00:00

0:00

20:07

0:00:00

24:00

Unit - 2 

3.249

3.238

13:26

0:00:00

0:00:00

0:00

10:34

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

1.811

1.799

7:36

0:00:00

0:00:00

0:00

16:24

0:00:00

24:30

Unit - 5 

3.555

3.533

15:03

0:00:00

0:00:00

0:00

8:57

0:00:00

24:00

Unit - 6 

1.169

1.164

4:58

0:00:00

0:00:00

0:00

19:02

0:00:00

24:00

 

Total

10.546

10.492

44:56

0:00:00

0:00:00

0:00

99:04

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

115

Max. Dam Level

1493.65

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

110

Min. Dam Level

1483.10

Wangtoo

686

17:00

297

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

71

20:00

71

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0