SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 18.03.10 is 35957.438 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 18.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

8.438

8.915

8.831

126.536

135.348

139.477

137.927

6393.950

6799.442

6862.366

6801.498

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.723

1.043

3:04

0:00:00

0:00:00

0:00

20:56

0:00:00

24:00

Unit - 2 

3.503

3.404

14:51

0:00:00

0:00:00

0:00

9:09

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

1.132

0.000

4:30

0:00:00

0:00:00

0:00

19:30

0:00:00

24:30

Unit - 5 

3.557

3.602

14:44

0:00:00

0:00:00

0:00

9:16

0:00:00

24:00

Unit - 6 

0.000

0.560

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

8.915

8.831

37:09

0:00:00

0:00:00

0:00

106:51

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

93

Max. Dam Level

1490.85

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

93

Min. Dam Level

1480.50

Wangtoo

319

17:00

226

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

64

20:00

64

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0