SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 17.03.10 is 35948.607 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 17.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.998

8.712

8.609

118.479

126.910

130.562

129.096

6385.893

6791.004

6853.451

6792.667

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.055

1.043

4:26

0:00:00

0:00:00

0:00

19:34

0:00:00

24:00

Unit - 2 

3.445

3.404

14:22

0:00:00

0:00:00

0:00

9:38

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 4 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:30

Unit - 5 

3.645

3.602

15:17

0:00:00

0:00:00

0:00

8:43

0:00:00

24:00

Unit - 6 

0.567

0.560

2:21

0:00:00

0:00:00

0:00

21:39

0:00:00

24:00

 

Total

8.712

8.609

36:26

0:00:00

0:00:00

0:00

107:34

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

92

Max. Dam Level

1489.70

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

92

Min. Dam Level

1479.25

Wangtoo

239

12:00

212

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

64

20:00

64

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0