SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 15.03.10 is 35931.426 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 15.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.657

8.083

7.988

102.365

110.869

113.175

111.915

6369.779

6774.963

6836.064

6775.486

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.465

0.460

1:52

0:00:00

0:00:00

0:00

22:08

0:00:00

24:00

Unit - 2 

4.140

4.091

17:31

0:00:00

0:00:00

0:00

6:29

0:00:00

24:00

Unit - 3 

0.179

0.177

0:47

0:00:00

0:00:00

0:00

23:13

0:00:00

24:00

Unit - 4 

0.861

0.851

3:31

0:00:00

0:00:00

0:00

20:29

0:00:00

24:00

Unit - 5 

2.012

1.988

8:36

0:00:00

0:00:00

0:00

15:24

0:00:00

24:00

Unit - 6 

0.426

0.421

1:47

0:00:00

0:00:00

0:00

22:13

0:00:00

24:00

 

Total

8.083

7.988

34:04

0:00:00

0:00:00

0:00

109:56

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

86

Max. Dam Level

1493.60

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

86

Min. Dam Level

1483.20

Wangtoo

190

17:00

157

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

67

20:00

67

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0