SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 14.03.10 is 35923.438 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 14.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.990

7.664

7.573

94.308

103.212

105.092

103.927

6361.722

6767.306

6827.981

6767.498

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

0.276

0.273

1:06

0:00:00

0:00:00

0:00

22:54

0:00:00

24:00

Unit - 2 

2.818

2.784

11:39

0:00:00

0:00:00

0:00

12:21

0:00:00

24:00

Unit - 3 

0.272

0.269

1:14

0:00:00

24:00:00

0:00

22:46

0:00:00

0:00

Unit - 4 

0.447

0.442

1:46

0:00:00

0:00:00

0:00

22:14

0:00:00

24:00

Unit - 5 

2.022

1.998

8:23

0:00:00

0:00:00

0:00

15:37

0:00:00

24:00

Unit - 6 

1.829

1.807

8:19

0:00:00

0:00:00

0:00

15:41

0:00:00

24:00

 

Total

7.664

7.573

32:27

0:00:00

0:00:00

0:00

111:33

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

84

Max. Dam Level

1493.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

80

Min. Dam Level

1481.60

Wangtoo

198

12:00

170

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

58

20:00

58

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0