SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 12.03.10 is 35908.223 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 12.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

8.057

7.420

7.495

7.407

78.194

87.819

89.693

88.712

6345.608

6751.913

6812.582

6752.283

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

1.030

1.018

4:58

0:00:00

0:00:00

0:00

19:02

0:00:00

24:00

Unit - 2 

2.661

2.629

11:42

0:00:00

0:00:00

0:00

12:18

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

24:00

0:00:00

0:00

Unit - 4 

0.860

0.850

3:52

0:00:00

0:00:00

0:00

20:08

0:00:00

24:00

Unit - 5 

2.644

2.613

11:19

0:00:00

0:00:00

0:00

12:41

0:00:00

24:00

Unit - 6 

0.300

0.297

1:17

0:00:00

0:00:00

0:00

22:43

0:00:00

24:00

 

Total

7.495

7.407

33:08

0:00:00

0:00:00

0:00

110:52

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

82

Max. Dam Level

1490.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

78

Min. Dam Level

1481.10

Wangtoo

192

7:00

170

17:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

55

20:00

55

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0