SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 04.03.10 is 35849.418 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 04.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

6.208

7.302

7.421

7.334

24.832

29.731

30.179

29.907

6292.246

6693.825

6753.067

6693.478

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.948

2.913

11:52

0:00:00

0:00:00

0:00

12:08

0:00:00

24:00

Unit - 2 

1.379

1.363

5:52

0:00:00

0:00:00

0:00

18:08

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

2.523

2.493

10:04

0:00:00

0:00:00

0:00

13:56

0:00:00

24:00

Unit - 5 

0.571

0.565

2:14

0:00:00

0:00:00

0:00

21:46

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

7.421

7.334

30:02

0:00:00

24:00:00

0:00

89:58

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

80

Max. Dam Level

1492.75

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

77

Min. Dam Level

1482.85

Wangtoo

182

12:00

152

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

N/A

N/A

N/A

N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0