SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 03.03.10 is 35842.084 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 03.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

6.208

7.385

7.920

7.855

18.624

22.429

22.758

22.573

6286.038

6686.523

6745.646

6686.144

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.895

2.867

12:19

0:00:00

0:00:00

0:00

11:41

0:00:00

24:00

Unit - 2 

2.842

2.818

12:24

0:00:00

0:00:00

0:00

11:36

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.588

1.581

6:42

0:00:00

0:00:00

0:00

17:18

0:00:00

24:00

Unit - 5 

0.595

0.589

2:25

0:00:00

0:00:00

0:00

21:35

0:00:00

24:00

Unit - 6 

0.000

0.000

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

7.920

7.855

33:50

0:00:00

24:00:00

0:00

86:10

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

79

Max. Dam Level

1494.15

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

83

Min. Dam Level

1484.35

Wangtoo

176

17:00

141

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

64

20:00

64

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0