SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 02.03.10 is 35834.229 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 02.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

6.208

7.557

7.532

7.471

12.416

15.044

14.838

14.718

6279.830

6679.138

6737.726

6678.289

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.369

2.346

11:48

0:00:00

0:00:00

0:00

12:12

0:00:00

24:00

Unit - 2 

1.490

1.479

6:49

0:00:00

0:00:00

0:00

17:11

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.709

1.701

7:21

0:00:00

0:00:00

0:00

16:39

0:00:00

24:00

Unit - 5 

1.964

1.945

9:28

0:00:00

0:00:00

0:00

14:32

0:00:00

24:00

Unit - 6 

0.000

0.705

0:00

0:00:00

0:00:00

0:00

24:00

0:00:00

24:00

 

Total

7.532

7.471

35:26

0:00:00

24:00:00

0:00

84:34

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

80

Max. Dam Level

1494.65

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1485.15

Wangtoo

200

12:00

174

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

60

20:00

60

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0