SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 01.03.10 is 35826.758 MU
Year 2009-2010 

DAILY GENERATION  REPORT FOR 01.03.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

6.208

7.487

7.306

7.247

6.208

7.487

7.306

7.247

6273.622

6671.581

6730.194

6670.818

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

 

Unit - 1 

2.345

2.322

10:32

0:00:00

0:00:00

0:00

13:28

0:00:00

24:00

Unit - 2 

1.198

1.189

5:34

0:00:00

0:00:00

0:00

18:26

0:00:00

24:00

Unit - 3 

0.000

0.000

0:00

0:00:00

24:00:00

0:00

0:00

0:00:00

0:00

Unit - 4 

1.487

1.479

6:19

0:00:00

0:00:00

0:00

17:41

0:00:00

24:00

Unit - 5 

1.566

1.552

7:07

0:00:00

0:00:00

0:00

16:53

0:00:00

24:00

Unit - 6 

0.710

0.705

2:42

0:00:00

0:00:00

0:00

21:18

0:00:00

24:00

 

Total

7.306

7.247

32:14

0:00:00

24:00:00

0:00

87:46

0:00:00

120:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

80

Max. Dam Level

1494.80

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

76

Min. Dam Level

1485.15

Wangtoo

206

17:00

159

7:00

Water Spillage

-

Max. TRT Level

N/A

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

0

#N/A

0

#N/A

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

0

0