SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 30.06.10 is 38537.361 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 30.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.177

36.778

36.452

1004.780

1046.681

1058.055

1049.346

2233.618

2404.970

2424.572

2404.463

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.259

6.196

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.078

6.029

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.948

5.888

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.262

6.222

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.097

6.026

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.134

6.091

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.778

36.452

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1132

Max. Dam Level

1495.20

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

383

Min. Dam Level

1492.30

Wangtoo

2778

5:00

1953

22:00

Water Spillage

-

Max. TRT Level

1011.00

SFT

N/A

N/A

N/A

N/A

Water utilised for SFT flushing

-

Min. TRT Level

1010.50

Draft Tube

2372

6:00

1453

20:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

30

8