SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION
Total Power
Generated Till Dated 24.06.10 is 38317.006 MU
Year 2010-2011
DAILY GENERATION REPORT FOR 24.06.10
GENERATION
(MU)
|
DAILY |
MONTHLY Cuml. |
YEARLY Cuml. |
| ||||||||||||||
|
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
MOU Gross Target |
Schedule Target (Ex-Bus) |
Gross Achieved |
Ex-Bus Achieved |
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
| ||||||
|
35.149 |
22.965 |
22.685 |
22.487 |
793.886 |
828.505 |
837.700 |
830.823 |
2022.724 |
2186.794 |
2204.217 |
2185.940 | ||||||
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
Unit No. |
Daily (MU) |
Running Hours |
Planned Outage |
Forced Outage due to break down in M/C |
Misc. |
Availability |
Remarks | ||||||||||
|
High PPM/RED ALERT |
Less Avail. of Water |
Grid Constraints ETC. | |||||||||||||||
|
|
Gross |
Ex-Bus |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
Hr:Min. |
||||||||
|
Unit - 1 |
3.804 |
3.773 |
14:58 |
0:00:00 |
0:00:00 |
9:02 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 2 |
3.804 |
3.774 |
15:05 |
0:00:00 |
0:00:00 |
8:55 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 3 |
3.352 |
3.319 |
14:04 |
0:00:00 |
0:00:00 |
9:56 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 4 |
3.884 |
3.854 |
15:05 |
0:00:00 |
0:00:00 |
8:55 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 5 |
3.907 |
3.867 |
15:55 |
0:00:00 |
0:00:00 |
8:05 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
Unit - 6 |
3.934 |
3.900 |
15:19 |
0:00:00 |
0:00:00 |
8:41 |
0:00 |
0:00:00 |
24:00 | ||||||||
|
| |||||||||||||||||
|
Total |
22.685 |
22.487 |
90:26 |
0:00:00 |
0:00:00 |
53:34 |
0:00 |
0:00:00 |
144:00 | ||||||||
|
| |||||||||||||||||
|
HYDROLOGICAL DATA | |||||||||||||||||
|
Discharge
for Generation (Cumecs) |
Level (Meters) |
SILT (PPM) | |||||||||||||||
|
Inflow for Generation |
1079 |
Max. Dam Level |
1495.00 |
|
Max. |
at (Hr.Min) |
Min. |
at(Hr.Min) | |||||||||
|
Water Utilized |
236 |
Min. Dam Level |
1463.50 |
Wangtoo |
3760 |
14:00 |
2421 |
22:00 | |||||||||
|
Water Spillage |
- |
Max. TRT Level |
N/A |
SFT |
3007 |
10:00 |
3007 |
10:00 | |||||||||
|
Water utilised for SFT flushing |
- |
Min. TRT Level |
N/A |
Draft Tube |
2646 |
11:00 |
1123 |
1:00 | |||||||||
|
|
Coarse Silt Particles | ||||||||||||||||
|
- |
Max. |
Min. | |||||||||||||||
|
Dam |
23 |
15 | |||||||||||||||
|
Draft Tube |
40 |
7 | |||||||||||||||