SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 24.06.10 is 38317.006 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 24.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

22.965

22.685

22.487

793.886

828.505

837.700

830.823

2022.724

2186.794

2204.217

2185.940

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

3.804

3.773

14:58

0:00:00

0:00:00

9:02

0:00

0:00:00

24:00

Unit - 2 

3.804

3.774

15:05

0:00:00

0:00:00

8:55

0:00

0:00:00

24:00

Unit - 3 

3.352

3.319

14:04

0:00:00

0:00:00

9:56

0:00

0:00:00

24:00

Unit - 4 

3.884

3.854

15:05

0:00:00

0:00:00

8:55

0:00

0:00:00

24:00

Unit - 5 

3.907

3.867

15:55

0:00:00

0:00:00

8:05

0:00

0:00:00

24:00

Unit - 6 

3.934

3.900

15:19

0:00:00

0:00:00

8:41

0:00

0:00:00

24:00

 

Total

22.685

22.487

90:26

0:00:00

0:00:00

53:34

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

1079

Max. Dam Level

1495.00

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

236

Min. Dam Level

1463.50

Wangtoo

3760

14:00

2421

22:00

Water Spillage

-

Max. TRT Level

N/A

SFT

3007

10:00

3007

10:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

2646

11:00

1123

1:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

23

15

Draft Tube

40

7