SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 19.06.10 is 38131.142 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 19.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

35.994

36.524

36.194

618.141

660.074

668.770

663.236

1846.979

2018.363

2035.287

2018.353

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.344

6.280

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.289

6.238

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.611

5.554

22:06

0:00:00

1:54:00

0:00

0:00

0:00:00

22:06

Unit - 4 

5.778

5.743

22:00

0:00:00

2:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

6.185

6.111

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.317

6.268

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.524

36.194

140:06

0:00:00

3:54:00

0:00

0:00

0:00:00

140:06

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

498

Max. Dam Level

1495.50

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

380

Min. Dam Level

1489.95

Wangtoo

1019

14:00

610

23:00

Water Spillage

-

Max. TRT Level

N/A

SFT

5828

6:00

1101

8:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

1277

21:00

278

7:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

16

4