SJVN LIMITED
NATHPA JHAKRI HYDROELECTRIC POWER STATION

Total Power Generated Till Dated 15.06.10 is 38001.391 MU
Year 2010-2011 

DAILY GENERATION  REPORT FOR 15.06.10

GENERATION (MU) 

DAILY

MONTHLY Cuml.

YEARLY Cuml.

 

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

MOU Gross Target

Schedule Target (Ex-Bus)

Gross Achieved

Ex-Bus Achieved

 

 

 

 

 

 

 

 

 

 

  

 

 

35.149

36.644

36.629

36.321

477.545

515.421

522.085

517.808

1706.383

1873.710

1888.602

1872.925

 

 

 

 

 

 

 

 

 

 

Unit No.

Daily (MU)

Running Hours 

Planned Outage

Forced Outage due to break down in M/C

Misc.

Availability 

Remarks

High    PPM/RED

ALERT

Less Avail. of Water

Grid Constraints ETC.

 

Gross

Ex-Bus

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Hr:Min.

Unit - 1 

6.264

6.201

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 2 

6.161

6.109

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 3 

5.828

5.772

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 4 

6.217

6.181

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 5 

5.992

5.929

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

Unit - 6 

6.167

6.129

24:00

0:00:00

0:00:00

0:00

0:00

0:00:00

24:00

 

Total

36.629

36.321

144:00

0:00:00

0:00:00

0:00

0:00

0:00:00

144:00

   

HYDROLOGICAL DATA

Discharge for Generation (Cumecs)
Satluj and Sholding 

Level (Meters)

SILT (PPM)

Inflow for Generation

387

Max. Dam Level

1495.35

 

Max.

at (Hr.Min)

Min.

at(Hr.Min)

Water Utilized

382

Min. Dam Level

1491.95

Wangtoo

1046

8:00

576

2:00

Water Spillage

-

Max. TRT Level

N/A

SFT

57083

18:00

16615

20:00

Water utilised for SFT flushing

-

Min. TRT Level

N/A

Draft Tube

468

11:00

267

14:00

 

Coarse Silt Particles

-

Max.

Min.

Dam

0

0

Draft Tube

18

7